Concord Bridge Dr. will be closed to through traffic from Klamath Falls Dr. to Hampton Falls Dr. (re-open date pending). Crews will be installing an 84-inch diameter water line crossing Concord Bridge Dr. within the project easement. During this closure, please use Bryant Pond Dr. to access Hampton Falls Dr. and Klamath Falls Dr.