Skip to content
Surface Water Supply Project
  • Home
  • About
    • About the SWSP
    • Traffic Updates
    • Doing business with the SWSP
    • Related Links
  • Construction Information
    • Construction (Main)
    • Segment A (A1 & A2)
    • Segment B (B1, B2, B3)
    • Segment C (C1 & C2)
    • Segment 3 (A1-A5 & B1)
    • Kinder Morgan (KM1 – KM6)
    • Central Pump Station
    • Re-Pump Station
    • Northeast Meter Station (NEMS)
    • IH-10 Meter Station
  • FAQs
  • Newsletter
  • Media Resources
  • Videos
  • Contact
Surface Water Supply Project
  • Home
  • About
    • About the SWSP
    • Traffic Updates
    • Doing business with the SWSP
    • Related Links
  • Construction Information
    • Construction (Main)
    • Segment A (A1 & A2)
    • Segment B (B1, B2, B3)
    • Segment C (C1 & C2)
    • Segment 3 (A1-A5 & B1)
    • Kinder Morgan (KM1 – KM6)
    • Central Pump Station
    • Re-Pump Station
    • Northeast Meter Station (NEMS)
    • IH-10 Meter Station
  • FAQs
  • Newsletter
  • Media Resources
  • Videos
  • Contact

Northeast Meter Station (NEMS)

The Northeast Meter Station is located in the Segment A-2 portion of the SWSP waterline. It is approximately 3 acres of undeveloped property southeast of the intersection of Water Works Blvd. and the Sam Houston Tollway.

NEMS – Installation of Meter Station Electrical Conduit May 2025

NEMS – Detention Pond Retaining Walls Completed May 2025

NEMS – 96-Inch Steel Pipe Stored on Site May 2025

NEMS – Installation of Detention Pond Retaining Walls April 2025

NEMS – Installation of Concrete Encased Ductbank April 2025

NEMS – Installation of Meter Station Drilled Shaft Caps April 2025

NEMS – Installation of Detention Pond Retaining Walls March 2025

NEMS – Detention Pond Drilled Shafts Completed March 2025

NEMS – Meter Station Drilled Shafts Completed March 2025

NEMS – Pouring of Detention Pond Retaining Walls Feb 2025

NEMS – Meter Station Drilled Shafts Completed Feb 2025

NEMS – Removal of Wall Formwork Feb 2025

NEMS – Setting Rebar Cages in Meter Station Drilled Shafts – Jan 2025

NEMS – NEMS Detention Pond Site – Jan 2025

NEMS – Setting Rebar for Detention Pond Retaining Wall – Jan 2025

Loading the next set of gallery items...
Load More

Anticipated Construction Program Schedule

DESIGN

End Fall 2021

BID

Summer 2024

CONSTRUCTION

Fall 2024 – Fall 2025

Design Consultant: DPOR

Contractor: To be posted

PDF Map: To be posted

Contractor Notice to Proceed: Fall 2024

Project Completion: Fall 2025

Dates are subject to change

Construction Menu

  • Construction (Main)
  • Segment A (A1 & A2)
  • Segment B (B1, B2, B3)
  • Segment C (C1 & C2)
  • Segment 3 (A1-A5 & B1)
  • Kinder Morgan (KM1 – KM6)
  • Central Pump Station
  • Re-Pump Station
  • Northeast Meter Station (NEMS)
  • IH-10 Meter Station
Disclaimer

The content contained in this website is provided by WHCRWA, as a service to you. This website and the information contained herein should not be relied upon or used as information for the purposes of securities disclosure about the authority or its financial condition. Persons should not rely upon this information when considering whether to buy, sell or hold bonds issued by the WHCRWA. All information contained herein speaks only as of the date indicated. The WHCRWA assumes no duty to update any information contained in this website at any time.

Copyright 2024 WHCRWA & NFBWA – Designed by The Texas Network

Page load link
Go to Top