- Approximately 6.1 miles
- Pipeline Diameter: 66” to 84” (5.82 miles of 66” diameter to 0.25 mi. of 84” diameter).
The Kinder Morgan segment is a 66-inch welded steel water line running along a Kinder Morgan pipeline corridor. The project was divided into six segments (KM1 – KM6) for construction. Construction of the Kinder Morgan Segments (KM-1 – KM-6), which are west of Fry Road to I-10 / Grand Parkway, will commence and be completed as a part of the 2025 conversion program and is expected to be completed by late 2026.
KM1
- Pipeline Diameter: 66″ to 84″
- 0.9 miles in length
Anticipated Construction Program Schedule
DESIGN
Summer 2024
BID
Late 2024
CONSTRUCTION
To be Determined
Design Consultant: Halff Associates
Contractor: (To be determined)
PDF Map: SWSP – Kinder Morgan – KM1
Contractor Notice to Proceed: (To be determined)
Project Completion: (To be determined)
Dates are subject to change
KM2
- Pipeline Diameter: 66″ to 84″
- 1 mile in length
Anticipated Construction Program Schedule
DESIGN
Summer 2024
BID
Late 2024
CONSTRUCTION
To be Determined
Design Consultant: IDS Engineering
Contractor: (To be determined)
PDF Map: SWSP – Kinder Morgan – KM2
Contractor Notice to Proceed: (To be determined)
Project Completion: (To be determined)
Dates are subject to change
KM3
- Pipeline Diameter: 66″ to 84″
- 1 mile in length
Anticipated Construction Program Schedule
DESIGN
Summer 2024
BID
Late 2024
CONSTRUCTION
To be Determined
Design Consultant: Garver
Contractor: (To be determined)
PDF Map: SWSP – Kinder Morgan – KM3
Contractor Notice to Proceed: (To be determined)
Project Completion: (To be determined)
Dates are subject to change
KM4
- Pipeline Diameter: 66″ to 84″
- 1.1 miles in length
Anticipated Construction Program Schedule
DESIGN
Summer 2024
BID
Late 2024
CONSTRUCTION
To be Determined
Design Consultant: LAN
Contractor: (To be determined)
PDF Map: SWSP – Kinder Morgan – KM4
Contractor Notice to Proceed: (To be determined)
Project Completion: (To be determined)
Dates are subject to change
KM5
- Pipeline Diameter: 66″ to 84″
- 1 mile in length
Anticipated Construction Program Schedule
DESIGN
Summer 2024
BID
Late 2024
CONSTRUCTION
To be Determined
Design Consultant: Jones & Carter
Contractor: (To be determined)
PDF Map: SWSP – Kinder Morgan – KM5
Contractor Notice to Proceed: (To be determined)
Project Completion: (To be determined)
Dates are subject to change
KM6
- Pipeline Diameter: 66″ to 84″
- 1 mile in length
Anticipated Construction Program Schedule
DESIGN
Complete
BID
Summer 2024
CONSTRUCTION
To be Determined
Design Consultant: Black & Veatch
Contractor: (To be determined)
PDF Map: SWSP – Kinder Morgan – KM6
Contractor Notice to Proceed: (To be determined)
Project Completion: (To be determined)
Dates are subject to change